Home/Subsidies/Power Tariff Subsidy Scheme
POWER COST SCHEME

Power Tariff Subsidy Scheme

Reduce Electricity Costs for Micro & Small Enterprises

Max Subsidy
POWER COST SCHEME
Power Tariff Subsidy Scheme
About This Scheme

Power Tariff Subsidy Scheme

The Power Tariff Subsidy Scheme provides a direct per-unit electricity cost reduction of ₹2 per unit to Micro and Small Enterprises in C and D category blocks of Haryana. The benefit is available on connected loads of up to 40 kW in D category blocks and up to 30 kW in C category blocks.

Subsidy of ₹2 per unit of electricity consumed

Available up to 40 kW connected load in D category blocks

Available up to 30 kW connected load in C category blocks

Applicable to Micro & Small enterprises only

Apply Now
Key Benefits

Why Apply for This Scheme

Lower Power Bills

₹2 per unit reduction translates to significant monthly savings for manufacturing units.

Higher Margins

Direct reduction in operating costs improves profitability without effort.

Backward Area Push

Targeted at C & D blocks to make electricity affordable for rural industry.

Continuous Benefit

Recurring monthly benefit as long as the unit remains eligible.

No Capital Needed

Unlike equipment subsidies, this requires no upfront investment to avail.

Competitive Cost

Lower power costs help C & D block MSMEs compete with urban manufacturers.

Power Tariff Subsidy Scheme process
Our Process

How Swastik Consultants Helps

01

Eligibility Verification

We confirm your block category and load eligibility for the power tariff subsidy.

02

Registration Assistance

We file the subsidy registration with DHBVN / UHBVN on your behalf.

03

Bill Reconciliation

We help verify that the per-unit subsidy is correctly applied to your bills.

04

Renewal Support

We assist with periodic renewal of the subsidy registration as required.

Start Your Application
Eligibility

Who Can Apply?

Micro or Small Enterprise registered under Udyam

Unit located in C or D category block

Electricity connection for industrial use

Connected load within prescribed limits (40 kW / 30 kW)

Registered with District Industries Centre

No pending electricity dues

Documents Required

What You Need

Udyam Registration Certificate

Electricity connection certificate (industrial category)

Recent electricity bills (last 3 months)

Block category certificate

PAN Card and GST registration

Bank account details

DIC registration certificate

Cancelled cheque

Ready to Claim Your Subsidy?

Let our experts identify the right schemes for your business and handle everything end-to-end.